• Fairfield, CA 94533
  • CA Lic. #1149164
  • Free estimates
  • Se habla español
goldrrremodeling2@gmail.com

Bathroom remodeling in Fairfield, CA

  • Licensed CA general contractor #1149164
  • Free estimate
  • Se habla español

We remodel bathrooms in Fairfield and the cities around it. Most of our bathroom jobs are full gut remodels. We take the room down to the framing and the subfloor, look at what is behind the walls, and build it back with a new shower, tile, vanity, mirror, lights and fixtures.

Gold R.R Remodeling is a small crew with more than 13 years of experience and California contractor license #1149164. The owner works on the job himself and speaks Spanish. The part of a bathroom you never see is the part that keeps it dry, so we take our time on the backer board, the shower pan and the waterproofing before any tile goes on.

How we build a bathroom

It starts with a free estimate at your home. We measure the room, look at the condition of the walls and floor, and ask how you use the bathroom. You get the scope and the expected timing in writing, so you know what is included before we start.

The work follows a fixed order. Demolition first. Then the shower pan, the backer board and the waterproofing. Only when that is done and cured do we open a box of tile. Before we mix thinset we lay the tile out dry. We center the pattern on the wall you see first, plan where the cuts land, and keep thin slivers out of the corners. A niche is sized and placed so the grout lines run through it.

Keeping the work area clean is one of our priorities. We cut tile outside when we can, cover what stays in the room, and clean up as we go. Because the crew is small, you talk to the same person who is setting your tile.

Walk-in tile shower with pebble floor, glass panel and rain head, remodel by Gold R.R Remodeling, Fairfield, CA
Walk-in tile shower with pebble floor, glass panel and rain head, remodel by Gold R.R Remodeling, Fairfield, CA

What is included

  • Demolition and protection

    We cover the floors on the way in, then remove the old tub or shower, tile, vanity and flooring. Debris goes out as we work so it does not pile up in your house.

  • Shower pan built on site

    A tile shower floor starts with a sloped mortar bed and a PVC pan liner. The slope sends water to the drain. The liner keeps it out of the framing.

  • Backer board and waterproofing

    Shower walls get cement backer board, not regular drywall. We roll a waterproofing membrane over the walls, niche, bench and curb and let it cure before we set tile.

  • Shower and wall tile

    Walk-in showers with subway tile or large-format porcelain, recessed niches, a tiled bench and a pebble-stone floor if you want one.

  • Bathroom floor tile

    An uncoupling membrane goes down under the floor tile. Large-format porcelain is set with a leveling-clip system so the edges sit flat with each other.

  • Vanity, mirror and fixtures

    We install the new vanity, mirror and lights, and replace the faucet, shower trim and toilet as part of the remodel.

  • Glass, paint and trim

    The glass panel goes in after the tile is finished. Then we patch and paint the walls, set the baseboards and caulk every joint that needs it.

Materials and finishes

Every project is completed using the appropriate materials. In a bathroom that means products made for wet areas: cement board, a waterproofing membrane, porcelain or stone tile, and grout and sealant meant for showers.

You choose the tile, the vanity and the fixtures. We tell you what each choice needs underneath, what size works with your layout, and how much care it takes once you are living with it.

  • Large-format porcelain on walls and floors
  • Subway tile, stacked or offset
  • Pebble-stone shower floor
  • Recessed niche for shampoo and soap
  • Tiled shower bench
  • Fixed glass panel in place of a curtain
  • New vanity, mirror and light fixtures

Timing

How long a bathroom takes depends on the scope: the size of the room, how much tile there is, and what we find once the old walls come out. Mortar and waterproofing also need time to cure, and we do not rush that step. The expected timing is given to you in writing with the estimate.

Remodeled hall bathroom with navy vanity, stone-look top and gray floor tile by Gold R.R Remodeling, Fairfield, CA
Remodeled hall bathroom with navy vanity, stone-look top and gray floor tile by Gold R.R Remodeling, Fairfield, CA

Our Bathroom Remodeling work

See all projects

Questions about Bathroom Remodeling

Can you remodel the whole bathroom or only the shower?

Either one. Most of our bathroom work is full remodels, but we also rebuild a shower by itself, retile a floor or replace a vanity. We look at the room during the free estimate and tell you plainly what makes sense.

How do you waterproof a tile shower?

In layers. The floor gets a sloped mortar bed with a PVC pan liner. The walls get cement backer board. Then a roll-on waterproofing membrane covers the walls, niche, bench and curb. Tile and grout are the finish, not the waterproofing, so all of this is done before the first tile is set.

Can you turn a bathtub into a walk-in shower?

Yes. We remove the tub, build the shower pan in its place and tile the walls up from there. You can add a niche, a bench and a glass panel. We check the drain location and the framing during the estimate.

Do you do the plumbing and electrical work?

We replace fixtures as part of a remodel, such as faucets, shower trim, toilets and light fixtures. Anything beyond that, including permit questions, depends on the job. We confirm the exact scope with you during the free estimate.

Do you work outside Fairfield?

Yes. We are based in Fairfield and also remodel bathrooms in Benicia, American Canyon, Vallejo, Napa and other nearby cities. Estimates are free. Call or text (707) 430-8295.

Let's make your dream a reality. Let's work together.

Free estimates across Fairfield and the North Bay. Call, text, or send the form with a few photos.

GOLD R R REMODELING, CA Lic. #1149164

Text us